Ⅰ 幫忙英語人工翻譯
The first standard workshop was built in Yankuang group mainland machinery co., LTD in 2000.
It began to organizing for Procing digital controlled lathes in 2002.
With the host of the corporation ,Yankuang group mainland machinery co., LTD ,in 2005,the first standard workshop was constructed ,the standard demand being resolved and the practice for action being edited.
The job as factory director and secretary of the position was resigned e to unhealthy parents between late 2006 to 2008,replaced by Executive General Manager in Linyi .At the same time,the international patent for invention was hostde to declare ,Hybrid grilled slag machine series procts were designed and began to be on sale ,which several other domestic companies has been modeled on procing so far and was identified for ISO90001,with the idition of two standards of such procts,registeration of two brands and science and technology support fund when talented expert database was joined in in Linyi.
Ⅱ 幫忙英語人工翻譯
During the period of 2007 and 2008 ,I attented three farm machinery exhibitions in jinan and in Hefei.
In recent ten years in a row,I participated in the metal cutting machine tools exhibitions in Beijing, Shanghai, Nanjing and jinan .
In my spare time in 2006,I began to design, research and develop CNC and spline shaft milling machine and geot the certificate of invention in 2013 having currently finished a total of six specifications of 3 d drawings, engineering drawing.I was the first in Jining history to be awarded the second prize of indivial innovation in 2014 whose patent numbers are 201110114587.5 and 201120138723 x, which can be both consulted in Chinese patent network, website or international capital project network .
Returning to the Mainland Yankuang Group Machinery co., LTD. for work In 2009 as vice minister for equipment power in project department, deputy director of the host gear and the construction of the project coordinating with the plant construction, responsible for bidding tender equipment research, writing, organizing bidding, technical agreement and signing contract, equipment installation, acceptance, payment, etc., I joined in the prohibit corruption of the yankuang group ring the same year.
Ⅲ 幫忙將以下簡歷進行人工英語翻譯,謝謝
In yankuang group in 2000 mainland machinery co., LTD., created the yankuang group, the first standardized workshop.
Numerical control car in 2002 began to organize proction.
Presided over 2005 in the company (personally decomposition group company standardization requirements, write the implementation of standards) created the yankuang group mainland machinery co., LTD. The first standardized workshop.
The second half of 2006 to 2008 (e to the mother's body is not very good, take care of their parents) resigned from the factory director and secretary of the position, to leave, in their hometown linyi an enterprise as a general manager, presided over to buy an international invention patent; Personally designed hybrid grilled slag machine series proct, applied for a patent for invention and proction of sales, at present there are several generic proction in domestic; Preside over the ISO90001 quality certification; Personally written two patented proct enterprise standards; Two registered trademark; Shandong province of China and the support of science and technology funds; During the join linyi talent expert database.
From 2007 to 2008 in jinan ring the period of leave the host, such as hefei three farm machinery exhibition.
More than ten years in a row participated in the Beijing, Shanghai, nanjing, jinan and other metal cutting machine tools exhibition.
Spare time in 2006 began to design, research and development of CNC and spline shaft milling machine to get the certificate of invention in 2013, is currently a total of six specifications of 3 d drawings, engineering drawing, the second prize of jining city indivial innovation in 2014 is the first in the history of jining people to receive the honor, patent number: 201110114587.5, 201120138723 x, in the Chinese patent network, website, international capital projects network all can look up to.
Work back to the mainland yankuang group machinery co., LTD. In 2009, equipment power, vice minister and project department, deputy director of the host gear and the construction of the project, coordinate the plant construction, responsible for bidding tender equipment research, writing, organizing bidding, technical agreement and contract, equipment installation, acceptance, payment, etc., prohibit corruption.this joined the yankuang group.
2012 and scraping machine, deputy director of the new project, coordinate the plant construction, responsible for project research investigation, writing bid tendering, review the technical agreement, contract, coordinate equipment installation, acceptance, payment, have some equipment procurement and marketing resources.
Daily work in the company is mainly responsible for equipment management and maintenance, overhaul, plane (non-standard) manufacturing, procurement, environmental protection and energy saving, file management, equipment operation proceres to write, equipment inspection, d Jane planning and implementation of assessment work, and the company's internal quality auditors, site safety civilization proction administrator (collaborative assessment of safety supervision inspection equipment safe hidden trouble, and governance, the rectification implementation).
The field proction equipment has a wealth of judgment and ability.
With non-standard equipment design, matching, manufacturing, proction, assembly, debugging, comprehensive ability.
Familiar with the equipment management and maintenance, machine, electric, hydraulic, numerical control field failure judgment experience (company account in equipment more than 3000 units, the main proction equipment more than 1200).
Procurement, tendering, negotiation ability.
Save the card more than one thousand instries, our procts have the equipment market potential and resources.
Since 2006 using soildworks mapping, able to skillfully use soild works2012/64 modeling of engineering drawing design of mechanical procts, can skilled use of office software.
Expected monthly salary: 50000 yuan RMB.
Thank you, sorry to trouble you, please understanding, ZhuYang total in the auspicious, family and family happiness, also ShangQi zhu GUI company!
Ⅳ 兗礦職工辦停薪留職怎麼交錢
職工辦停薪留職,社保應該還是由原單位繳納,因為只有離職才辦理社保轉移,因此當事人可以到用人單位繳納自己部分。
相關法律依據:
根據《中華人民共和國勞動合同法》規定
第五十條用人單位應當在解除或者終止勞動合同時出具解除或者終止勞動合同的證明,並在十五日內為勞動者辦理檔案和社會保險關系轉移手續。
勞動者應當按照雙方約定,辦理工作交接。用人單位依照本法有關規定應當向勞動者支付經濟補償的,在辦結工作交接時支付。
用人單位對已經解除或者終止的勞動合同的文本,至少保存二年備查。